|
|
Bushing Replacement
AGECO International FZE works with its bushing original equipment manufacturer (OEM) to acquire a direct replacement bushing or determine an acceptable replacement for bushings that are obsolete and no longer manufactured.
Modifications to leads and/or connections to accommodate dimensional differences would be identified and reversing engineering will be conducted to adapt new leads/connectors.
Complete installation service can include oil handling, lead modification (if necessary), vacuum fill (if required) and testing.
.png) |
|
|
|